The This Old House Hour
Lexington Project 2015: Conservation Concerns
TV-G
S13 E16 60mA covered gutter is installed; the infiltration system to disperse water from the gutters into the ground is detailed; native plants that will return part of the lawn back to nature are discussed; and how existing aluminum wiring is being worked with while updating recessed light fixtures and installing sconces over the mantel. Also: the making and testing of two types of windows for the project. In the second half: transforming an old backsplash; and installing a new kitchen faucet.
Where to Watch Lexington Project 2015: Conservation Concerns