Crane DownOne of Australia's largest hydro power stations undertakes a high stakes valve replacement; they have six hours to get the 800kg replacement part down six stories.
Piece By Piece
E2
Piece By PieceThe Kooragang Coal Terminal is buzzing with the arrival of a newly designed Ship Loading Spout and Trimmer Flap.
Rush Hour
E3
Rush HourIn Central Queensland, the army mechanics from the 2nd/14th Light Horse Regiment have two hours to overhaul a tank suspected of hoarding unwanted debris.
Back On Track
E4
Back On TrackThe mechanics at Brisbane's Gallipoli Barracks's Light Horse Regiment aim to complete two huge tasks.
Sky High Stakes
E5
Sky High StakesThe team at Murray 1, Snowy Hydro's second-largest power station, reassemble a massive power turbine after they find extensive cracking in the top cover.
Slowly But Surely
E6
Slowly But SurelyA week-long mechanical marathon for the team of Queensland Rail mechanics, as they work to hoist a six-tonne V12 engine.
Feeling the Heat
E7
Feeling the HeatThe team from Lindores Construction Logistics have one day to relocate a massive tower crane on the Queens Wharf development in Brisbane.
Risky Repairs
E8
Risky RepairsSouth of Jindabyne, a mini hydro station has long-awaited repair work done, thanks to the arrival of a brand new submerged discharge valve.
Blast Off!
E9
Blast Off!Tensions are high at the Gilmour Space Technologies test facility on the Gold Coast, where the team prepares to put their brand new rocket through its second test.
Time is Money
E10
Time is MoneyIn Sydney, Leichhardt Bus Depot, one of the largest in the Southern hemisphere, the team has to scramble to repair two buses before the morning rush hour.
Take Plex everywhere
Watch free anytime, anywhere, on almost any device.